Does the BCP include inspection data on the date the inspection was completed or the date that the vehicle was closed out on?
For example, if an inspection was completed on 1/11 but the RO was closed on 1/14, which date do we expect that data to show under in the BCP?
The BCP counts the inspection data towards the date the vehicle was closed out. In the example above, the inspection rate would count towards 1/14 even though the inspection was completed on 1/11. Additionally, the BCP only includes closed-out repair orders in the data overall.
If there are multiple revisions of the same inspection in AutoVitals, which is counted towards the BCP inspection metrics?
The highest revision number will count toward the inspection data even if the lower revision number was the most recently edited.